Project Name: Metallurgical Plant

Location: Hungary

Type: Engineering

Design of gas purification system. Working documentation on:

  • blast furnace №2,

  • reconstruction,

  • central ventilating trunk of cast house.

Period of service: 1988.

This description should be only used as an example of a successfully completed project by Russian companies and specialists.


Other Projects

Plant for the production of cast iron

Development of project documentation of installing of gas cleaning unit behind the recovery boiler, including gas exhaust ducts from the recovery boiler to gas purification and from gas cleaning up to ...

Products for the company Fuchs

Manufacture of metal structures and equipment for electric steel furnaces and ladle furnace unit. Period of service: 1998-1999. This description should be only used as an example of a successfully ...

Metallurgical Plant of full cycle

Construction of agglomeration plant №3 with capacity of 3,611,000 tonnes of sinter per year, agglomachine with sintering area of 408 sq.m. Capacity: performance, achieved in 2013, is 3.4 million tons ...